首页 知识 AnadministratorhasanexistingHMCandPOWER6570connecte

AnadministratorhasanexistingHMCandPOWER6570connecte

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

参考答案:A

本文来自网络,不代表煤炭资讯立场。转载请注明出处: http://www.mtxh.cn/bk/zs-bk/412976.html
上一篇
下一篇

作者: Anita

为您推荐

返回顶部